Advertisements
Advertisements
Home COMMUNITY BULLETIN Twelve-hour power outage Saturday in AG, Reclamation substations

Twelve-hour power outage Saturday in AG, Reclamation substations

Advertisements

Power will be interrupted in certain areas of Bacolod Saturday, 12 December 2020.

This is part of the maintenance of the National Grid Corporation of the Philippines 100MVA transformer affecting the Bacolod-Reclamation 69KV Transmission Line.

Affected areas from 6 a.m. to 6 p.m. ASDES-Gonzaga Substation 1 to 6 and Reclamation Substation (Reclamation Feeders: RF1, RF2, RF3, Rf4, RF5).

Advertisements

CENECO reminded consumers that the cooperative owns the distribution lines while NGCP holds the Transmission thus any occurrence that may happen in the transmission facilities is beyond CENECO’s control.

Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons.

When electricity supply resumes, they are to provide allowance of about 10 to 15 minutes before switching on all electrical appliances and facilities to avoid power surge.

Advertisements
Hannah A. Papasin
Hannah A. Papasinhttp://facebook.com/hannah.mariveles
Writer. Critic. Professor. She started writing since primary school and now has two published textbooks on communication. A film buff, she's a Communication, Media Literacy and Journalism Professor of the University of St. La Salle-Bacolod, and has a Master's Degree in English.

Leave a Reply

Latest News

Advertisements

TRENDING